full text File Size: 176 K bytes | Add this to my bookbag

   Container / Location    Title
 
Series I. Blueprints and Drawings [series]:
  2-12  
Blueprints
  14  
Aerial Posters
  14  
Subreflector Antenna Backup Structure
  14  
Final Construction As-built Plan
  15  
Gregorian Upgrading S-Series Drawings
  21  
Visitor Center Blueprints
  25  
Gregorian Upgrading - Drawings S 1-47
  55  
Misc. drawings (undated) ()
 
J. Padilla [subseries]:
  55  
Wheel, Upper, Backward CH1, B-M01-041& Wheel, Upper, Backward CH2, B-M01-042, 6-20-90 (B-M01-041 & -042)
  55  
Backward Lower Wheel CH1 (C-M01-060)
  55  
Ground Screen Project, Topographic map of reflector area ()
  55  
Rosado, S. - Contractor's Staging Area Layout (D-M06-43)
 
Soberal, F. [subseries]:
  55  
430 MHz Horn Assy. (D-M01-076)
  55  
"As-Built" Center Bearing Assembly (D-M01-074)
  55  
"As Built" 430 MHz Wave Guide Assembly (D-M01-077)
  55  
Hanger to Structure Clearances (C-M01-063)
  55  
Elevation Rail & C.H. Wheel Detail (C-M01-064)
  55  
Elevation Rail Modification Proposal (C-M01-066)
  55  
Elevation Trolleys Modification Proposal (D-M01-079)
  55  
Stupp Bros. Bridge & Iron Co. - Preliminary Layout, Staging Platform (PL-1)
  55  
Radiation Systems Inc. - Rail & Rack Finger Shim Packs (15075)
  55  
S.R. - S-Band Transformer Power Supply Bldg Details (D-M05-202)
 
COMSAT RSI [subseries]:
  55  
Panel Assembly Arecibo Subflector (Prelim.) (122630)
  55  
Vertex Panel/Ring Assembly (122755)
  55  
Vertex Panel Assembly (122760)
  55  
Barreto, N. - Optical Laboratories Building (D-M05-221 thru -237)
 
Radiation Systems Inc. [subseries]:
  55  
Feed Platform Main Truss Reinforcement (15040)
  55  
Temporary Bracing U2-L3 (15061)
  55  
Taitem Engineering - Cable Machine Layout in Klystron Room, Cable Layout in Cable Carrier, 5-11-94 (L1)
 
Continental Electronics [subseries]:
  55  
Arecibo Dome Interface Data (190098)
  55  
Cooling Diagram, S-Band Transmitter (190099)
  55  
Waveguide Section-Circular WC-354 (118249)
  56  
Canron Construction Corp. - Structural Upgrade Rigging Schematic Plan (92-001)
 
COMSAT RSI [subseries]:
  56  
Truss #1 Arecibo Subreflector (122726 (8 pgs))
  56  
Truss #2 Arecibo Subreflector (122727 (8 pgs))
  56  
Truss #3 Arecibo Subreflector (122728 (8 pgs))
  56  
Truss #4 Arecibo Subreflector (122729 (8 pgs))
  56  
Truss #5 Arecibo Subreflector (122730 (8 pgs))
  56  
Truss #6 Arecibo Subreflector (122731 (7 pgs))
  56  
Truss #7 Arecibo Subreflector (122732 (6 pgs))
  56  
Truss #8 Arecibo Subreflector (122733 (5 pgs))
  56  
Truss #9 Arecibo Subreflector (122734 (4 pgs))
  56  
Truss # 10 Arecibo Subreflector (122735 (3 pgs))
  56  
Truss #11 Arecibo Subreflector (122725 (2 pgs))
  56  
Joint Plate Truss Weldment (122736 (3 pgs))
  56  
Sleeve, Hoop-Truss (122737)
  56  
Saddle, Hoop-Truss (122738)
  56  
Slotted Bracket Assembly (122739)
  56  
Vertex Bracket Weldment (122740)
  56  
Hoop Segment, Panel Support (122742)
  56  
U-Boldt (122743)
  56  
Adjustable Collection Plate Assy (122745 (3 pgs))
  56  
Vertex Ring (122746)
  56  
Radial Truss Standoff Assembly (122748 (2 pgs))
  56  
Shim (122749)
  56  
Arecibo Subreflector/Backup Structure Assy (122750 (8 pgs))
  56  
Standoff Weldment (122751 (2 pgs))
  56  
Angle Braces, Truss (122752 (3 pgs))
  56  
Special Saddle (122753)
  56  
Fixture, Weldment (SK7138)
  56  
Weldment, Sub-Assy (SK7139)
  56  
Collar Extension (122754 (3 pgs))
  56  
Mounting Plate-Vertex Ring (122756)
 
AMMANN & WHITNEY [subseries]:
  56  
Gregorian Upgrading - title sheet (S-1A)
  56  
Gregorian Upgrading - General I (S-1)
  56  
Gregorian Upgrading - General II (S-2)
  56  
Gregorian Upgrading - Anchorages I (S-3)
  56  
Gregorian Upgrading - Anchorages II (S-4)
  56  
Gregorian Upgrading - Anchorage Reinforcing (S-5)
  56  
Gregorian Upgrading - Anchorages Metalwork (S-6)
  56  
Gregorian Upgrading - Tower Saddle I (S-7)
  56  
Gregorian Upgrading - Tower Saddle II (S-8)
  56  
Gregorian Upgrading - Feed Platform I (S-9)
  56  
Gregorian Upgrading - Feed Platform II (S-10)
  56  
Gregorian Upgrading - Feed Platform III (S-11)
  56  
Gregorian Upgrading - Feed Platform IV (S-12)
  56  
Gregorian Upgrading - Feed Platform V (S-12A)
  56  
Gregorian Upgrading - Cable Details (S-13)
  56  
Gregorian Upgrading - Tensioning of Cable System (S-13A)
  56  
Gregorian Upgrading - Feed Arm Reinforcing I (S-14)
  56  
Gregorian Upgrading - Feed Arm Reinforcing II (S-15)
  56  
Gregorian Upgrading - Feed Arm Reinforcing III (S-16)
  56  
Gregorian Upgrading - Feed Arm Reinforcing IV (S-17)
  56  
Gregorian Upgrading - Feed Arm Reinforcing V (S-18)
  56  
Gregorian Upgrading - Feed Arm Reinforcing VI (S-19)
  56  
Gregorian Upgrading - Feed Arm Outriggers I (S-20)
  56  
Gregorian Upgrading - Feed Arm Outriggers II (S-21)
  56  
Gregorian Upgrading - Feed Arm Outriggers III (S-22)
  56  
Gregorian Upgrading - Feed Arm Outriggers IV (S-23)
  56  
Gregorian Upgrading - Elevation Rail & Rack Gear I (S-24)
  56  
Gregorian Upgrading - Elevation Rail & Rack Gear II (S-25)
  56  
Gregorian Upgrading - Azimuth Trolley Link Truss (S-26)
  56  
Gregorian Upgrading - Azimuth Feed Track (S-27)
  56  
Gregorian Upgrading - Feed Arm Miscellaneous I (S-28)
  56  
Gregorian Upgrading - Feed Arm Miscellaneous II (S-29)
  56  
Gregorian Upgrading - Gregorian Trolley I (S-30)
  56  
Gregorian Upgrading - Gregorian Trolley II (S-31)
  56  
Gregorian Upgrading - Gregorian Trolley III (S-32)
  56  
Gregorian Upgrading - Gregorian Enclosure (S-33)
  56  
Gregorian Upgrading - Gregorian Support System I (S-34)
  56  
Gregorian Upgrading - Gregorian Support System II (S-35)
  56  
Gregorian Upgrading - Gregorian Support System III (S-36)
  56  
Gregorian Upgrading - Gregorian Support System IV (S-37)
  56  
Gregorian Upgrading - Gregorian Support System V (S-37A)
  56  
Gregorian Upgrading - Gregorian Support System VI (S-38)
  56  
Gregorian Upgrading - Feed Module I (S-39)
  56  
Gregorian Upgrading - Feed Module II (S-40)
  56  
Gregorian Upgrading - Feed Module Framing I (S-41)
  56  
Gregorian Upgrading - Feed Module Framing II (S-42)
  56  
Gregorian Upgrading - Feed Module Framing III (S-43)
  56  
Gregorian Upgrading - Azimuth Trolley I (S-44)
  56  
Gregorian Upgrading - Azimuth Trolley II (S-45)
  56  
Gregorian Upgrading - Azimuth Trolley III (S-46)
  56  
Gregorian Upgrading - Tower Collars, Steel Platforms & Ladders (S-47)
  57  
Cutler-Gallaway Services, Inc. Contemporary Constructors - Ground Screen Project (S1.1 thru S7.3)
  57  
NAB Construction Corp - Preliminary Mast Location, Ground Screen Project (3 pages)
 
Mendez Brunner Badillo - A Visitor Center for the Arecibo Observatory [subseries]:
  58  
Site and Ground Floor Plan (C1)
  58  
Horizontal Control Site Plan (C2)
  58  
Site Details (C3)
  58  
Site Details (C4)
  58  
First and Second Floor Plans (A1)
  58  
Roof Drainage Plan & Sections (A2)
  58  
Elevations (A3)
  58  
Sections (A4)
  58  
Reflected Ceiling & Floor Pattern Plans (A5)
  58  
Wall Sections (A6)
  58  
Toilet Floor Plans and Details (A7)
  58  
Door Schedule (A8)
  58  
Window Schedule and Details (A9)
  58  
Miscellaneous Details (A10)
  58  
Store Floor Plan and Details (A11)
  58  
Auditorium Floor Plan and Details (A12)
  58  
Main Stair, Ramp & Auditorium Stair Details (A13)
  58  
Foundation Plan, Sect. & Structural Notes (S1)
  58  
Structural Second Floor Plan & Section (S2)
  58  
Structural Roof Plan & Sections (S3)
  58  
Structural Wall Elevations (S4)
  58  
First, Second Floor & Roof Plan Air Conditioning Layout (AC-1)
  58  
Notes and Scheduled (AC-2)
  58  
Details (AC-3)
  58  
First and Second Floor Plan Sanitary Piping Layout (P-1)
  58  
First and Second Floor Plan Cold Water Piping Layout (P-2)
  58  
Enlarged Plans, Sanitary & C.W. Piping Isometric, Details and Notes (P-3)
  58  
First and Second Lighting Floor Plans (E-1)
  58  
First and Second Electrical Floor Plans (E-2)
  58  
Electrical One Line Diagram and Schedules (E-3)
  58  
Mero-Raumstruktur - Tertiary Subreflector Antenna Back-up Structure (95132)
 
Ammann & Whitney [subseries]:
  59  
Tie-Down Cable System Plan, Elevation & Cable Details (3 pgs) ()
  59  
Upgrading of Elevation Railway (14 pgs) ()
  59  
Gregorian Secondary Reflector Plan (ST-1)
  59  
Secondary Reflector Truss Sections I (ST-2)
  59  
Secondary Reflector Truss Sections II (ST-3)
  59  
Secondary Reflector Truss Sections III (ST-4)
  59  
Secondary Reflector Truss Sections (ST-5)
 
Taitem Engineering [subseries]:
  59  
Cable Machine Final Assembly (A1-1 & A1-2)
  59  
Torque Tube Assembly (A4 Rev 1)
  59  
Cable Carrier Assembly (A5)
  59  
Idler Drum Assembly (A6 Rev 1)
  59  
Cart Support & Cart Rail Assembly (A8)
  59  
Cable Anchor Assembly (A10)
  59  
Cable Anchor Assembly & Cable Support Assembly (A11)
  59  
Torque Tube Details (D4)
  59  
Details (D11)
  59  
Torque Tube Details (D41 Rev 1)
  59  
Cart Support & Cart Rail Details (D81)
 
RSI Drawings [subseries]:
  59  
Truss Reinforcement (15040)
  59  
Temporary Bracing U2-L3 (15061)
  60  
LTV Electrosystems, Inc. - Arecibo Reflector Upgrading Project, Cable Anchorages (401-50041)
  60  
Mero Structures, Inc. - Tertiary Subreflector, General Arrangement/Connection Details (200-0)
  60  
Von Seb Inc. - Concrete Towers & Anchorages (8-1 thru 8-13, R8-14)
  60  
F. Soberal - Center Bearing Assembly (D-M01-074)
  60  
Rotary Joint Assembly (D-M01-075)
  60  
Clark Machine & Welding - 13 pages w/ Survival Rail Supports, Survival Lock, Plate, Guide Block, Yoke Assembly, Gusset, Azimuth Drive Trolley Assembly, Hub, Idler Assembly, Elevation Detail, Hub Drive, Arm Jack, Pivot Arms (D11-3, D11-4, D11-10, D11-11)
 
F. Soberal [subseries]:
Original vellums included.

  61  
Platform Equipment Layout I Top Cord (D-M01-081)
  61  
Platform Equipment Layout II Bottom Cord (D-M01-082)
  61  
Azimuth Equipment Layout (D-M01-083)
  61  
Platform Equipment Layout III at Corner 4 (D-M01-084)
  61  
Platform Equipment Layout IV at Rotary Joint (D-M01-085)
  61  
Platform Equipment Layout V at Rotary Joint (D-M01-086)
  61  
Anchor Equipment Layout (D-M01-087)
 
Von Seb Inc. [subseries]:
  61  
Monorail Cable Drum Details ()
  61  
Tower Obstruction Ligthing (E-1)
  61  
Excavation, Grading, Compacted Fill & Service Road (1-7, R8-R12)
 
Continental Electronics - S-Band Transmitter [subseries]:
  61  
Preferred Duplexer Arrangement & Drive System (116743)
  61  
H.V. Power Supply Shelter (116789)
  61  
Duplexer Arrangements (116741)
  61  
High Devel DC Modulator Simplified Circuit (116790)
  61  
Hydraulic Schematic Klystron Cooling (116762)
  61  
Isometric Piping Layout (116779)
  61  
RF Block Diagram (116782)
  61  
Hydraulic Schematic Electronic Regulator Cooling (116763)
  61  
High Power S-Band Transmitter Control Monitor Unit (116761)
  61  
TR Switch, Planetary Mode (116768)
  61  
Modulator (116756)
  61  
Regulator Switch Tube Anode (116759)
  61  
HF Electronic Regulator Simplified Circuit (116752)
  61  
Power Distribution One line & D.C. Schematic (116767)
  61  
Meter Panels for T V Monitoring (116757)
  61  
Articulated Water Piping (116760)
  61  
Layout Carriage House (116764)
 
Canron Construction Corp. - Temcor [subseries]:
  61  
Gregorian Enclosure Plan & Elevation (D-101)
  61  
Gregorian Enclosure Section & Axonometric View (D-102)
  61  
Gregorian Enclosure Sections & Views (D-103)
  61  
Dome Node Coordination Drawing (D-104)
  61  
Feed Module - Perspective View (D-201)
  61  
Feed Module Elevations (D-202)
  61  
Feed Module Framing Plan (D-203)
  61  
Feed Module - Floor Plans (D-204)
  61  
Feed Module Framing II (D-205)
  61  
Feed Module Framing (D-206)
  61  
Flat Roof Isometric View (D-301)
  61  
Flat Roof Plan & Isometric Views (D-302)
  61  
Flat Roof Sections & Details (D-303)
 
Von Seb Inc. [subseries]:
  62  
Electrical Work, Antenna (E12-1 thru E12-19)
  62  
Tie-Down Anchorages TD-1 & TD-11 (8-X1)
  62  
Towers & Waveguide Anchorage (8-15)
  62  
Steel Platforms & Ladders (8-16)
  62  
Tie-Down Anchorages TD-1 & TD-11 (8-17)
  62  
Layout of Main Cables (C9-2)
  62  
Elevations of Cable System (C9-3)
  62  
Miscellaneous Anchorage Details in Towers (8-18)
  62  
Anchorage Metalwork (C9-5)
  62  
Anchor Bolt Frame in Towers (C9-7)
  62  
Modified Tower Section & Wave Guide Anchorage (R9-44)
  62  
Tie-Down Anchorages TD-1 & TD-11 (R9-45)
  62  
Miscellaneous Anchorage Details in Towers (R9-46)
  62  
Tower T4 and Anchorage A4 (8-3)
  62  
Tower T8 and Anchorage A8 (8-4)
  62  
Tower T12 and Anchorage A12 (8-5)
  62  
Anchorages - Reinforcement (8-8)
  62  
Anchorages - Cable Frame (8-9)
  62  
Tie-Down Anchorages Concrete & Reinforcement (8-10)
  62  
Steel Platforms & Ladders (8-13)
  62  
Modified Tower Section & Wave Guide Anchorage (8-15)
  62  
Steel Platforms & Ladders (8-16)
  62  
Tie-Down Anchorages TD-1 & TD-11 (8-17)
  62  
Tie-Down Anchorages TD-1 & TD-11 (8-17)
  62  
Miscellaneous Anchorage Details in Towers (8-18)
  63  
Cable & Anchorage Metalwork, Central Feed Structure (C9-1 thru C9-10; S9-11 thru S9-29; R9-30 thru R9-41)
  63  
Reflector (10-1 thru 10-8, R10-9 thru R10-14)